Brocade Communications Systems NetIron CER Series Installation Guide

Browse online or download Installation Guide for Network switches Brocade Communications Systems NetIron CER Series. Brocade Communications Systems NetIron CER Series Installation guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 120
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
53-1003263-02
March 17 2015
Brocade NetIron CES 2000
Series and NetIron CER
2000 Series
Hardware Installation Guide
Supported Release: Multi-Service IronWare R05.8.00a
Page view 0
1 2 3 4 5 6 ... 119 120

Summary of Contents

Page 1 - 2000 Series

53-1003263-02March 17 2015Brocade NetIron CES 2000Series and NetIron CER2000 SeriesHardware Installation GuideSupported Release: Multi-Service IronWar

Page 2

• Brocade Supplemental Support augments your existing OEM support contract, providing directaccess to Brocade expertise. For more information, contact

Page 3 - Contents

China CC statementEurope and Australia (CISPR 22 Class A Warning)This is a Class A product. In a domestic environment this product may cause radio int

Page 4

FCC warning (US only)This equipment has been tested and complies with the limits for a Class A computing device pursuantto Part 15 of the FCC Rules. T

Page 5

VCCI statement102 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 6

Caution and Danger Notices● Cautions...

Page 7 - Document conventions

PRECAUCIÓN Asegúrese de que el flujo de aire en las inmediaciones de las partes anterior, laterales yposterior del instrumento no esté restringido.CAU

Page 8 - Notes, cautions, and warnings

PRECAUCIÓN Use el comando erase startup-config (borrar configuración de inicio) para sistemas nuevossolamente. Si usted introduce este comando en un s

Page 9 - Brocade resources

CAUTIONBefore plugging a cable into to any port, be sure to discharge the voltage stored on the cableby touching the electrical contacts to ground sur

Page 10 - Document feedback

MISE ENGARDETous les équipements dotés de sources d'alimentation électrique secteur sont destinés à êtreinstallés uniquement dans des zones à acc

Page 11 - About This Document

PRECAUCIÓN La fuente de alimentación está diseñada exclusivamente para el uso con los dispositivos deBrocade NetIron CES Series y Brocade NetIron CER

Page 12 - Notice to the reader

PRECAUCIÓN Para un sistema de CC, utilice un cable de conexión a tierra de calibre de cablenorteamericano (AWG) número 6. El cable 6 AWG deberá acopla

Page 13 - Related publications

About This Document● Audience...

Page 14

CAUTIONCarefully follow the mechanical guides on each side of the power supply slot and make surethe power supply is properly inserted in the guides.

Page 15 - Product Overview

Un paragraphe Danger indique des conditions ou des situations potentiellement mortelles ouextrêmement dangereuses. Des labels de sécurité sont posés d

Page 16

PELIGRO Antes de comenzar la instalación, consulte las precauciones en la sección “Power Precautions”(Precauciones sobre corriente).DANGERDisconnect t

Page 17

DANGER Pour des raisons de sécurité, la dragonne ESD doit contenir une résistance de série 1 mégaohm.PELIGRO Por razones de seguridad, la correa de mu

Page 18

PELIGRO Verifique que elige el instrumento para circuitos apropiado dependiendo del número desuministros de energía de CC instalados en el chasis. La

Page 19

GEFAHR Stellen Sie sicher, dass das Gestell für die Unterbringung des Geräts auf angemessene Weisegesichert ist, so dass das Gestell oder der Schrank

Page 20 - Product overview

Danger Notices116 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 21 - Upgrade applications

Index10/100/1000 ports 3110 Gbps ports 312x10-gigabit Ethernet moduleinstallation 93installing 93removal 93AaccessCLI 65access levelCONFIG 39Privilege

Page 22 - Hardware features

enable passwordassigning 39Ffan speeds 36FCC warning (US only) 101featuresBrocade NetIron CER 2024C 26Brocade NetIron CER 2024F 26Brocade NetIron CER

Page 23

pin assignments 79management port function 43modelsCER 15CES 15Nnetwork connection 43network interfaces 31Network mask 41Oonline help 66operating envi

Page 24

Supported devicesTABLE 1 Brocade NetIron XMR Series Brocade MLX Series NetIron CES 2000 and NetIron CER 2000 SeriesBrocade NetIron XMR 4000Brocade N

Page 25

TTelnet connection 65telnet server command 43Temperature 82temperature thresholds 36terminal emulation 63Uunpacking a system 45upgrade packages 21VVCC

Page 26

Corporation Referenced Trademarks and ProductsMozilla Corporation Mozilla FirefoxOracle Corporation Java Runtime EnvironmentRelated publicationsFor th

Page 27

Related publications14 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 28

Product Overview● Introduction... 15

Page 29 - Control features

• Brocade NetIron CES Series 2048F -- accommodates 48-port 100/1000 Hybrid Fiber (HF) model• Brocade NetIron CES Series 2048FX -- accommodates 48-port

Page 30

FIGURE 5 Brocade NetIron CES Series 2048CFIGURE 6 Brocade NetIron CES Series 2048FFIGURE 7 Brocade NetIron CES Series 2048CXFIGURE 8 Brocade NetIron C

Page 31 - Supported optics

• Brocade NetIron CER Series 2024C-4X -RT -- accommodates 24-port 10/100/1000 RJ45 modelwith 4 combination 100/1000 Hybrid Fiber (HF) ports and 4x10G

Page 32 - 10 Gigabit Ethernet ports

FIGURE 11 Brocade NetIron CER Series 2024CFIGURE 12 Brocade NetIron CER Series 2024FFIGURE 13 Brocade NetIron CER Series 2048CProduct OverviewBrocade

Page 33 - Port regions

© 2015, Brocade Communications Systems, Inc. All Rights Reserved.ADX, Brocade, Brocade Assurance, the B-wing symbol, DCX, Fabric OS, HyperEdge, ICX, M

Page 34 - Power supplies

FIGURE 14 Brocade NetIron CER Series 2048FFIGURE 15 Brocade NetIron CER Series 2048CXFIGURE 16 Brocade NetIron CER Series 2048FXProduct overviewThe Br

Page 35 - DC power supplies

FIGURE 17 Brocade NetIron CES Series 2000 Series switchThe Brocade NetIron CER Series 2000 Series is a compact 1 RU, IP, MPLS, and multi-VRF enabledme

Page 36 - Cooling system and fans

Upgrade kits TABLE 2 Brocade part number DescriptionNI-CES-2024-MEU Metro Edge Premium upgrade for Brocade NetIron CES Series 2000 Series 24-portmod

Page 37

Brocade NetIron CES Series 2024F-4XThe Brocade NetIron CES Series 2024F-4X has twenty-four 100/1000 MbE SFP ports plus fourcombination 10/100/1000 MbE

Page 38

RJ45 out-of-band management port, one resilient six-unit fan tray, and two AC power supply bays for1+1 redundancy with one 500W AC power supply includ

Page 39 - Password assignment

FIGURE 24 Brocade NetIron CES Series 2048CX device1 10 GbE XFP ports2 Forty-eight 10/100/1000 MbE RJ45 portsBrocade NetIron CES Series 2048FBrocade Ne

Page 40 - IP address configuration

1 10 GbE XFP ports2 Forty eight 100/1000 MbE SFP portsBrocade NetIron CER Series 2024CThe Brocade NetIron CER Series 2024C router has twenty-four 10/1

Page 41 - Support of sub-net masks

FIGURE 28 Brocade NetIron CER Series 2024F device1 Four combination 10/100/1000 MbE RJ45 ports with support for optional 10Gbe XFP ports2 Twenty-four

Page 42

port labeled Console, one 10/100/1000 MbE RJ45 out-of-band management port, one resilient six-unitfan tray, and two AC power supply bays for 1+1 redun

Page 43 - Device connection

resilient six-unit fan tray, and two AC power supply bays for 1+1 redundancy with one 500W AC powersupply included.FIGURE 32 Brocade NetIron CER Serie

Page 44

ContentsPreface...7D

Page 45 - Installation

LEDs for 10/100/1000 Mbps ports (Continued)TABLE 3 LED Position State MeaningBlinking Port is transmitting or receiving trafficLnk/Act Bottom Right

Page 46 - Summary of installation tasks

Network interfacesThis section describes the port types in the Brocade NetIron CES Series, Brocade NetIron CER Series2000 series devices.10/100/1000 M

Page 47 - Installation precautions

SFP-compliant transceivers for the 100/1000 Ethernet interface module TABLE 5 Part number DescriptionE1MG-TX SFP Copper, RJ-45 connectorE1MG-SX 1000

Page 48

Into a physical port, you must insert a fiber-optic transceiver provided by device. The XFP/SFP+-compliant fiber-optic modules provide an optical tran

Page 49 - Installation site preparation

• Port 2/1 (10-GbE uplink port on Brocade NetIron CES Series 2048CX, Brocade NetIron CES Series2048FX, Brocade NetIron CER Series 2048CX, and Brocade

Page 50 - Installing an AC power supply

The power supplies can be swapped in or out of the device while the device is running. You can removeand insert a power supply without opening the cha

Page 51

FIGURE 34 DC Power SupplyAbout redundant power supplies and power supply failureA device with redundant power supplies can maintain full operation whe

Page 52 - Installing a DC power supply

NOTEBrocade NetIron CES/CER-4X-RT supports the XNI-CE-2000-FAN pre-installed or as a spare. All othermodels support the NI-CE-2000-FAN.The fans in the

Page 53

Cooling system and fans38 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 54

Connecting to a Network Device● Password assignment...

Page 55 - Device installation

Assigning an IP address to an interface, virtual interface, orloopback...

Page 56

1. At the opening CLI prompt, enter the following command to change to the Privileged level of theEXEC mode.device> enabledevice# 2. Access the CON

Page 57 - Mid rack mount position

• Support of sub-net masks• How to assign an IP address to a management interface• How to assign an IP address to an interface or virtual interface ov

Page 58 - Reverse rack mount position

Syntax: [no] ip address ip-addr/mask-bitsAssigning an IP address to an interface, virtual interface, or loopbackAs you have done with other devices, y

Page 59 - System power

Enabling and disabling the interfacesBy default, all interfaces are disabled. To enable an interface, you must enter the enable command atthe appropri

Page 60 - Operation verification

For information on installing fiber-optic modules see Device connection.For information on cabling a fiber-optic module, see Device connection.For inf

Page 61 - Verifying proper operation

Installation● System unpacking...45● Summary o

Page 62

CAUTIONBefore plugging a cable into to any port, be sure to discharge the voltage stored on the cableby touching the electrical contacts to ground sur

Page 63 - PC or terminal attachment

Installation precautionsFollow these precautions when installing the unit.DANGERRisk of explosion if battery is replaced by an incorrect type. Dispose

Page 64

CAUTIONEnsure that the device does not overload the power circuits, wiring, and over-currentprotection. To determine the possibility of overloading th

Page 65 - CLI Functionality

CAUTIONAll devices with DC power supplies are intended for installation in restricted access areas only.A restricted access area is where access can b

Page 66 - Line editing commands

Power supply replacement...81Installation precautions and warnings...

Page 67

Redundant power supply installationThe Brocade device ships with one alternating-current (AC) power supply or direct-current (DC) powersupply. All mod

Page 68

Follow the procedure given below to install an AC power supply.1. If necessary, remove the power supply locking screws located in the upper left and t

Page 69

CAUTIONFor a Brocade AC system, use a ground wire of at least 6 American Wire Gauge (AWG). Theground wire should have an agency-approved crimped conne

Page 70

5. Use the wire tightening screws to secure the wires.6. Insert the DC connector with wires to the power supply and tighten the two assembly screws.FI

Page 71

FIGURE 40 DC power supply screws1 Chassis attachment screws 2 Assembly screws9. Connect the wire to your DC power source, making sure to connect the -

Page 72

NOTETo insure adequate bonding when attaching the provided Panduit LCD6-10AF two-hole ground lug, aminimum of 20 inch pounds of torque is required to

Page 73 - Hardware Specifications

FIGURE 41 Front rack mount position5 Inch offset rack mount positionFIGURE 42 5 Inch offset rack mount position5 Inch offset rack mount position56 Bro

Page 74 - Physical dimensions

Mid rack mount positionFIGURE 43 Mid rack mount positionMid rack mount positionBrocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware In

Page 75

Reverse rack mount positionFIGURE 44 Reverse rack mount positionReverse rack mount position58 Brocade NetIron CES 2000 Series and NetIron CER 2000 Ser

Page 76 - Storage environment

FIGURE 45 Installing the Brocade device in a rackInstallation steps1. Mount the device in the rack as illustrated in Reverse rack mount position on pa

Page 77 - Port specifications

6 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 78 - Console port pin assignments

Powering on the system1. Ensure that all power supplies are fully and properly inserted and no power supply slots areuncovered.CAUTIONNever leave tool

Page 79

Verifying proper operation1. Connect the power cord supplied with the device to the power connector on the power supply on therear of the device.2. In

Page 80

LEDs for power and fan status for the 2024 models (Continued)TABLE 9 LED Position State MeaningAmber Supply has DC power, but output is notenabled.G

Page 81 - Hardware Maintenance

LEDs for power for the 2048 models (Continued)TABLE 10 LED Position State MeaningGreen Power supply has DC power, is enabled, and hasgood output.Gre

Page 82

3. Make sure the cable is securely connected to your PC and to the system.4. Check the settings in your terminal emulation program. In addition to the

Page 83 - AC power supply

Device Management Applications Familiarization● Management application overview...

Page 84 - Required tools

Online helpTo display a list of available commands or command options, enter "? " or press Tab. If you have notentered part of a command at

Page 85

CLI line editing commands TABLE 11 Ctrl-key combination DescriptionCtrl-A Moves to the first character on the command line.Ctrl-B Moves the cursor b

Page 86 - Removing the DC power supply

Displaying lines containing a specified stringThe following command filters the output of the show interface command for port 3/1 so it displaysonly l

Page 87

Ctrl-C to cancel the display. In addition, you can search and filter output from this prompt. For example.device# ? append Append one f

Page 88

Preface● Document conventions...7● Brocade resource

Page 89

whois WHOIS lookupwrite Write running configuration to flash or terminalAs with the commands for filtering output from

Page 90

Special characters for regular expressions (Continued)TABLE 12 Character Operation_ An underscore matches on one or more of the following:• , (comma

Page 91

Using special characters in regular expressions72 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 92

Hardware Specifications● Power specifications... 7

Page 93

Maximum power calculations at 100-240 VAC with two PSUs (Continued)TABLE 14 Devices Watts BTUs per hourBrocade NetIron CES Series 2024F with 2x10G u

Page 94 - Replacing the fan tray

Physical dimensions of the Brocade devices (Continued)TABLE 15 Devices Height Width Depth Weight (fully-loaded) (LB)Brocade NetIron CES Series2024C-

Page 95

Physical dimensions of the Brocade devices (Continued)TABLE 15 Devices Height Width Depth Weight (fully-loaded) (LB)Brocade NetIron CER Series2024F-

Page 96 - Cabling a fiber optic module

CoolingThe cooling fans cool the CPU, main memory, and voltage regulators. The fans use a pull configurationto move the air from the front of the devi

Page 97 - Tunable 10 GbE DWDM SFP+

DANGERThe intra-building port or ports of the equipment or subassembly is suitable for connection tointra-building or unexposed wiring or cabling only

Page 98

FIGURE 47 Console port pin assignments showing cable connection options to a terminal or PCManagement port pin assignmentsThe management port is an RJ

Page 99 - Regulatory Statements

Convention Descriptionvalue In Fibre Channel products, a fixed value provided as input to a commandoption is printed in plain text, for example, --sho

Page 100 - China CC statement

Management port pin assignments80 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide53-1003263-02

Page 101 - VCCI statement

Hardware Maintenance● Hardware maintenance schedule...81● Power suppl

Page 102

CAUTIONRemove the power cord from a power supply before you install it in or remove it from thedevice. Otherwise, the power supply or the device could

Page 103 - Caution and Danger Notices

AC power supplyThe AC power supply is shown in the following diagram.FIGURE 48 AC power supplyPower supplies for the devicesThe device ships with one

Page 104

Required toolsYou will need the following tool to perform this procedure:• #2 Phillips-head screwdriverThe following procedures are required when remo

Page 105 - Electrical cautions

FIGURE 50 Removing the power supply from the device5. Continue to pull the power supply until it is removed from the device.6. Place the power supply

Page 106

FIGURE 51 Power supply installationCAUTIONCarefully follow the mechanical guides on each side of the power supply slot and make surethe power supply i

Page 107

FIGURE 52 DC power supply screws1 Chassis attachment screws 2 Assembly screws4. Unscrew the chassis attachment screws to unlock the power supply itsel

Page 108

FIGURE 53 The DC wiring assembly1 Wire tightening screws 2 Assembly screws5. Pull the power supply outward once the screws have been unscrewed. This w

Page 109

FIGURE 54 The DC power supply4. Insert the wires into the DC wiring assembly (Installing a DC power supply).5. Use the wire tightening screws to secur

Page 110 - Danger Notices

Brocade resourcesVisit the Brocade website to locate related documentation for your product and additional Brocaderesources.You can download additiona

Page 111 - Electrical dangers

FIGURE 55 The DC wiring assembly1 Wire tightening screws 2 Assembly screws7. With one hand, hold the bar on the front panel of the power supply. With

Page 112

FIGURE 56 DC power supply screws1 Chassis attachment screws 2 Assembly screws9. Connect the wire to your DC power source, making sure to connect the -

Page 113

Verifying proper operationTo verify the proper operation of the power supply after power on, you can observe the LEDs on thepower supply.After the Bro

Page 114

and the status of the power supply. If you are not already attached to a terminal or a PC runningterminal emulation, see Displaying the status of the

Page 115 - Laser dangers

1. Power off the Brocade device.2. Use a #2 Phillips-head screwdriver to remove the blank faceplate or old module from the frontpanel.3. Install the 1

Page 116

4. Slide the new fan tray in and tighten the screws to secure it to the chassis.5. Plug the chassis back in and power up.Copper or Fiber optic module

Page 117 - 53-1003263-02

1 Bail latchNOTEThe bail latch may be attached to either the top or the bottom of the mini-GBIC.FIGURE 59 Grasping the bail latch, pull the copper or

Page 118

3. Gently insert the cable connectors (a tab on each connector should face upward) into the portconnectors until the tabs lock into place.4. Observe t

Page 119

When not using an SFP, SFP+, or XFP connector, make sure to keep the protective covering on.Hardware Maintenance98 Brocade NetIron CES 2000 Series and

Page 120

Regulatory Statements● BSMI statement (Taiwan)........................99● Cana

Comments to this Manuals

No comments