Brocade Communications Systems Mobility 7131 Series Installation Guide Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 65
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
Mounting the access point
2
14 Brocade Mobility 7131N-FGR Access Point Installation Guide
53-1001948-01
CAUTION
Do not actually connect to the power source until the cabling portion of
the installation is complete.
5. Verify the behavior of the access point LEDs. For more information, see “LED
indicators” on page 18.
6. Align the bottom of the ceiling T-bar with the back of the access point.
7. Orient the access point chassis by its length and the length of the ceiling T-bar.
8. Rotate the access point chassis 45 degrees clockwise.
9. Push the back of the access point chassis on to the bottom of the ceiling T-bar.
10. Rotate the access point chassis 45 degrees counter-clockwise. The clips click
as they fasten to the T-bar.
11. The access point is ready to configure. For information on basic access point
device configuration, see “Configuring basic device settings” on page 27.
AP7131N_InstallationGuide.book Page 14 Tuesday, August 24, 2010 5:09 AM
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 64 65

Comments to this Manuals

No comments