Brocade Communications Systems NetIron CER Series Manual Page 53

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 52
Version 1.1, 03/31/2015
GSS CCT Evaluation Technical Report Page 53 of 56 © 2015 Gossamer Security Solutions, Inc.
Document: AAR-BrocadeNetIron5.8 All rights reserved.
3.3 LIFE-CYCLE SUPPORT (ALC)
3.3.1 LABELLING OF THE TOE (ALC_CMC.1)
Assurance Activities: The evaluator shall check the ST to ensure that it contains an identifier (such as a product
name/version number) that specifically identifies the version that meets the requirements of the ST. The evaluator
shall ensure that this identifier is sufficient for an acquisition entity to use in procuring the TOE (including the
appropriate administrative guidance) as specified in the ST. Further, the evaluator shall check the AGD guidance
and TOE samples received for testing to ensure that the version number is consistent with that in the ST. If the
vendor maintains a web site advertising the TOE, the evaluator shall examine the information on the web site to
ensure that the information in the ST is sufficient to distinguish the product.
The evaluator verified that the ST, TOE and Guidance are all labeled with the same hardware versions and software
The evaluator checked the TOE software version and hardware identifiers during testing by examining the actual
machines in the Brocade Lab used for testing.
3.3.2 TOE CM COVERAGE (ALC_CMS.1)
Assurance Activities: The 'evaluation evidence required by the SARs' in this PP is limited to the information in the
ST coupled with the guidance provided to administrators and users under the AGD requirements. By ensuring that
the TOE is specifically identified and that this identification is consistent in the ST and in the AGD guidance (as done
in the assurance activity for ALC_CMC.1), the evaluator implicitly confirms the information required by this
component.
See 3.3.1 for an explanation of how all CM items are addressed.
3.4 TESTS (ATE)
3.4.1 INDEPENDENT TESTING - CONFORMANCE (ATE_IND.1)
Assurance Activities: The evaluator shall prepare a test plan and report documenting the testing aspects of the
system. The test plan covers all of the testing actions contained in the CEM and the body of this PP’s Assurance
Activities. While it is not necessary to have one test case per test listed in an Assurance Activity, the evaluator must
document in the test plan that each applicable testing requirement in the ST is covered.
Page view 52
1 2 ... 48 49 50 51 52 53 54 55 56

Comments to this Manuals

No comments