Brocade Communications Systems NetIron CER Series Installation Guide Page 90

  • Download
  • Add to my manuals
  • Print
  • Page
    / 120
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 89
FIGURE 55 The DC wiring assembly
1 Wire tightening screws 2 Assembly screws
7. With one hand, hold the bar on the front panel of the power supply. With the other hand, support the
underside of the power supply, and insert the power supply into the empty power supply slot. Press
until the supply is completely in the slot, so that the connectors on the back of the supply are fully
engaged with the pins on the power backplane (Installing the AC power supply on page 85).
CAUTION
Carefully follow the mechanical guides on each side of the power supply slot and make sure
the power supply is properly inserted in the guides. Never insert the power supply upside
down.
8. Secure the two screws near the edges of the supply to lock the supply in place (Installing a DC
power supply).
Hardware Maintenance
90 Brocade NetIron CES 2000 Series and NetIron CER 2000 Series Hardware Installation Guide
53-1003263-02
Page view 89
1 2 ... 85 86 87 88 89 90 91 92 93 94 95 ... 119 120

Comments to this Manuals

No comments